Earl Henrys Carriage Bridge

Grade 2 listed 18th Century stone coaching bridge.

Stonemasonry, carpentry and structural work 

Clear all vegetation from bridge structure 

Construct a series of movable timber centrings to prop the barrel vault during remedial work to the underside  

Dismantle failing parapet walls and ashlar stone spandrels  

Repair, replicate and replace selected stones to underside of stone barrel vault using locally quarried stone, carved on site 

Repair laminated parapet wall copings 

Rebuild parapet walls and spandrels using original stone 

Re-point underside of barrel vault  

Re-point ashlar stone parapet walls and spandrels 

Install two x French drains on either side of the bridge surface to minimise water run off through bridge walls.