Grade 2 listed 18th Century stone coaching bridge.
Stonemasonry, carpentry and structural work
Clear all vegetation from bridge structure
Construct a series of movable timber centrings to prop the barrel vault during remedial work to the underside
Dismantle failing parapet walls and ashlar stone spandrels
Repair, replicate and replace selected stones to underside of stone barrel vault using locally quarried stone, carved on site
Repair laminated parapet wall copings
Rebuild parapet walls and spandrels using original stone
Re-point underside of barrel vault
Re-point ashlar stone parapet walls and spandrels
Install two x French drains on either side of the bridge surface to minimise water run off through bridge walls.